Does an old building have to be given a new seismic design?
In principle the rules are not applied retroactively to old buildings, but a new design is required when a legally regulated building act takes place. In particular, seismic design is mandatory for every new building. For an existing building, structural safety confirmation under current law is required whenever an act that changes the structure takes place, such as an extension, major repair or change of use.
How long does it take to prepare the seismic design report and calculations for nonstructural components?
It depends on the size of the building and the number of fields reviewed (architectural, mechanical, electrical), but on average it takes about one to two weeks after the site measurement. If there is an urgent construction-start or completion deadline, the time can be shortened through HomeCheck's urgent-response process.
Do fire-protection nonstructural components only need seismic bracing in earthquake zones?
No. All of South Korea is a seismic design zone, and under the seismic design standard for fire-protection systems, all sprinkler piping and similar systems installed in buildings subject to mandatory seismic design must have seismic bracing. This is a requirement for fire-safety completion regardless of region.
Can construction proceed at our discretion as long as we have the structural review report?
Absolutely not. The structural review report and seismic calculations specify the embedment depth of particular anchor bolts, the spacing of braces, the thickness of members and so on. Construction that ignores these design values can be rejected at the completion inspection and, in an actual earthquake, can lead to a serious accident in which equipment comes loose. Construction must follow the design documents specified in the report.
On what basis are the costs of seismic design and structural review calculated?
The cost is determined by three main factors. First, the scope of the review (how far it extends across architectural elements such as exterior finishes, mechanical elements such as piping, and electrical equipment). Second, the gross floor area and number of stories (the taller the building, the larger the seismic amplification factor and the more complex the analysis). Third, whether drawings are available (if there are none and site measurement and reverse engineering are needed, costs may be added).
What are the risks of skipping the structural review when installing rooftop solar equipment?
The biggest risks are overturning from wind load and damage to the roof slab. Solar panels generate enormous uplift during a typhoon. Panels installed without a structural review have had their anchors pulled out of the slab and blown away, and fine cracks in the roof slab have become a source of serious leaks.
Who decides the importance factor applied to nonstructural components?
It is not set at the discretion of the building owner or contractor; it is determined under KDS 41 17 00, Korea's building seismic design standard issued by MOLIT. Fire-protection systems, objects that could fall onto evacuation routes, hazardous material storage and the like are legally assigned a factor of 1.5 without exception. HomeCheck determines clearly, on the basis of the regulations, whether a given facility falls under the 1.5 or 1.0 class.
What if the concrete breaks when anchors are set in an existing building?
In older buildings the concrete strength may be low and the anchors may not hold sufficiently. In such cases HomeCheck first carries out non-destructive strength measurement and, where necessary, proposes a strengthening design that spreads the load, for example by increasing the number of anchors or adding steel plates, to support safe installation.
We received a supplementation order from the fire station or district office. Can you help?
Yes, this is our most specialized area. HomeCheck's structural team prepares the technical evidence and additional calculations the officials require. Rather than simply passing on documents, we hold technical discussions based on a Professional Engineer's opinion, so the supplementation procedure can be completed quickly.
What legal disadvantages are there later if there is no seismic design confirmation document?
First, buildings subject to structural safety confirmation must submit the confirmation document with the construction-start report, so the permit procedure cannot proceed, and at the approval-for-use stage there is no material to confirm that construction followed the design documents, which can lead to supplementation requests. Second, if a disaster occurs and falling nonstructural components cause casualties, the building owner can be held criminally liable for neglecting management and safety. Finally, without lawful design documents, coverage under disaster or fire insurance may be limited when a claim is made.